chore(deps): pin dependency cally to 0.9.2 #22

Merged
forgejo-bot merged 1 commit from renovate/pin-dependencies into main 2026-10-09 05:35:40 +00:00
Collaborator

This PR contains the following updates:

Package Type Update Change
cally dependencies pin ^0.9.2 → 0.9.2

⚠️ Renovate's pin functionality does not currently wire in the release age for a package, so the Minimum Release Age checks can apply. You will need to manually validate the Minimum Release Age for these package(s).

Add the preset :preserveSemverRanges to your config if you don't want to pin your dependencies.


Configuration

📅 Schedule: (UTC)

  • Branch creation
    • At any time (no schedule defined)
  • Automerge
    • At any time (no schedule defined)

🚦 Automerge: Disabled by config. Please merge this manually once you are satisfied.

♻ Rebasing: Whenever PR is behind base branch, or you tick the rebase/retry checkbox.

🔕 Ignore: Close this PR and you won't be reminded about this update again.


  • If you want to rebase/retry this PR, check this box

This PR has been generated by Mend Renovate CLI.

This PR contains the following updates: | Package | Type | Update | Change | |---|---|---|---| | [cally](https://github.com/WickyNilliams/cally) | dependencies | pin | [`^0.9.2` → `0.9.2`](https://renovatebot.com/diffs/npm/cally/0.9.2/0.9.2) | ⚠️ Renovate's pin functionality [does not currently](https://github.com/renovatebot/renovate/issues/40288) wire in the release age for a package, so the Minimum Release Age checks can apply. You will need to manually validate the Minimum Release Age for these package(s). Add the preset `:preserveSemverRanges` to your config if you don't want to pin your dependencies. --- ### Configuration 📅 **Schedule**: (UTC) - Branch creation - At any time (no schedule defined) - Automerge - At any time (no schedule defined) 🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied. ♻ **Rebasing**: Whenever PR is behind base branch, or you tick the rebase/retry checkbox. 🔕 **Ignore**: Close this PR and you won't be reminded about this update again. --- - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box --- This PR has been generated by [Mend Renovate CLI](https://github.com/renovatebot/renovate). <!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiI0NC4xMTkuMSIsInVwZGF0ZWRJblZlciI6IjQ0LjExOS4xIiwidGFyZ2V0QnJhbmNoIjoibWFpbiIsImxhYmVscyI6W119-->
forgejo-actions changed title from fix(deps): pin dependency cally to 0.9.2 to chore(deps): pin dependency cally to 0.9.2 2026-10-04 17:29:40 +00:00

📊 Coverage

Metrik Abdeckung
Zeilen 98.21% (3457/3520)
Branches 83.55% (782/936)
Methoden 97.86% (548/560)

Patch-Coverage: keine getrackten Zeilen geändert

Schwächste Dateien im Projekt

Datei Abdeckung
app/components/form/select.rb 75.86%
app/components/layout/flash.rb 84.0%
app/views/app/bank/accounts/index.rb 86.44%
app/components/concerns/actionable.rb 86.67%
app/controllers/app/matrix/logins_controller.rb 87.5%
app/components/layout/sidebar.rb 89.47%
app/components/concerns/inferrable.rb 90.63%
app/models/concerns/has_uuid_v7.rb 90.91%
app/components/users/avatar.rb 91.23%
app/controllers/settings/security/otps_controller.rb 91.67%

🔍 Report im Browser ansehen · 📄 Run-Artifact „coverage-report“

<!-- coverage-report --> ## 📊 Coverage | Metrik | Abdeckung | |---|---| | Zeilen | 98.21% (3457/3520) | | Branches | 83.55% (782/936) | | Methoden | 97.86% (548/560) | **Patch-Coverage**: keine getrackten Zeilen geändert **Schwächste Dateien im Projekt** | Datei | Abdeckung | |---|---| | app/components/form/select.rb | 75.86% | | app/components/layout/flash.rb | 84.0% | | app/views/app/bank/accounts/index.rb | 86.44% | | app/components/concerns/actionable.rb | 86.67% | | app/controllers/app/matrix/logins_controller.rb | 87.5% | | app/components/layout/sidebar.rb | 89.47% | | app/components/concerns/inferrable.rb | 90.63% | | app/models/concerns/has_uuid_v7.rb | 90.91% | | app/components/users/avatar.rb | 91.23% | | app/controllers/settings/security/otps_controller.rb | 91.67% | [🔍 Report im Browser ansehen](https://pages.hoppe-dev.eu/hobbypunk-centinel/pr-22/coverage) · [📄 Run-Artifact „coverage-report“](https://code.hoppe-dev.eu/hobbypunk/centinel/actions/runs/2468/artifacts/coverage-report)
renovate changed title from chore(deps): pin dependency cally to 0.9.2 to fix(deps): pin dependency cally to 0.9.2 2026-10-04 18:09:14 +00:00
renovate force-pushed renovate/pin-dependencies from eb6027b0b4
Some checks failed
PR Triage / Triage pull request-1 (pull_request) Successful in 54s
PR Triage / Triage pull request (pull_request) Successful in 0s
CI / Quality / Brakeman (pull_request) Successful in 1m1s
CI / Quality / RuboCop (pull_request) Successful in 1m3s
CI / Quality / Bundler Audit (pull_request) Successful in 1m4s
CI / Quality (pull_request) Successful in 0s
CI / Tests / Unit (pull_request) Successful in 1m22s
CI / Tests / System (pull_request) Successful in 1m25s
CI / Tests / Coverage (pull_request) Failing after 27s
CI / Tests (pull_request) Failing after 0s
CI / Container / Build and push (pull_request) Has been skipped
CI / Container (pull_request) Failing after 0s
CI / Deploy (pull_request) Has been skipped
to e129720b0f
Some checks failed
CI / Quality / Brakeman (pull_request) Successful in 56s
CI / Quality / RuboCop (pull_request) Successful in 58s
CI / Quality / Bundler Audit (pull_request) Successful in 58s
CI / Quality (pull_request) Successful in 0s
CI / Tests / Unit (pull_request) Successful in 2m10s
CI / Tests / System (pull_request) Successful in 2m20s
CI / Tests / Coverage (pull_request) Failing after 39s
CI / Tests (pull_request) Failing after 0s
CI / Container / Build and push (pull_request) Has been skipped
CI / Container (pull_request) Failing after 0s
CI / Deploy (pull_request) Has been skipped
PR Triage / Triage pull request (pull_request) Successful in 0s
PR Triage / Triage pull request-1 (pull_request) Successful in 12s
2026-10-04 18:09:16 +00:00
Compare
forgejo-actions changed title from fix(deps): pin dependency cally to 0.9.2 to chore(deps): pin dependency cally to 0.9.2 2026-10-04 18:10:22 +00:00
renovate changed title from chore(deps): pin dependency cally to 0.9.2 to fix(deps): pin dependency cally to 0.9.2 2026-10-05 00:00:29 +00:00
forgejo-actions changed title from fix(deps): pin dependency cally to 0.9.2 to chore(deps): pin dependency cally to 0.9.2 2026-10-05 00:00:35 +00:00
renovate changed title from chore(deps): pin dependency cally to 0.9.2 to fix(deps): pin dependency cally to 0.9.2 2026-10-06 00:00:37 +00:00
forgejo-actions changed title from fix(deps): pin dependency cally to 0.9.2 to chore(deps): pin dependency cally to 0.9.2 2026-10-06 00:00:42 +00:00
renovate changed title from chore(deps): pin dependency cally to 0.9.2 to fix(deps): pin dependency cally to 0.9.2 2026-10-07 00:00:33 +00:00
forgejo-actions changed title from fix(deps): pin dependency cally to 0.9.2 to chore(deps): pin dependency cally to 0.9.2 2026-10-07 00:00:37 +00:00
forgejo-actions changed title from fix(deps): pin dependency cally to 0.9.2 to chore(deps): pin dependency cally to 0.9.2 2026-10-07 00:00:37 +00:00
forgejo-bot scheduled this pull request to auto merge when all checks succeed 2026-10-07 18:29:23 +00:00
forgejo-bot canceled auto merging this pull request when all checks succeed 2026-10-07 18:29:34 +00:00
forgejo-bot scheduled this pull request to auto merge when all checks succeed 2026-10-07 18:29:34 +00:00
renovate changed title from chore(deps): pin dependency cally to 0.9.2 to fix(deps): pin dependency cally to 0.9.2 2026-10-08 00:00:51 +00:00
renovate force-pushed renovate/pin-dependencies from e129720b0f
Some checks failed
CI / Quality / Brakeman (pull_request) Successful in 56s
CI / Quality / RuboCop (pull_request) Successful in 58s
CI / Quality / Bundler Audit (pull_request) Successful in 58s
CI / Quality (pull_request) Successful in 0s
CI / Tests / Unit (pull_request) Successful in 2m10s
CI / Tests / System (pull_request) Successful in 2m20s
CI / Tests / Coverage (pull_request) Failing after 39s
CI / Tests (pull_request) Failing after 0s
CI / Container / Build and push (pull_request) Has been skipped
CI / Container (pull_request) Failing after 0s
CI / Deploy (pull_request) Has been skipped
PR Triage / Triage pull request (pull_request) Successful in 0s
PR Triage / Triage pull request-1 (pull_request) Successful in 12s
to b420d19f91
All checks were successful
CI / Quality / Bundler Audit (pull_request) Successful in 46s
CI / Quality / RuboCop (pull_request) Successful in 56s
CI / Quality / Brakeman (pull_request) Successful in 1m13s
CI / Quality (pull_request) Successful in 0s
CI / Tests / Unit (pull_request) Successful in 1m58s
PR Triage / Triage pull request (pull_request) Successful in 0s
PR Triage / Triage pull request-1 (pull_request) Successful in 6s
CI / Tests / System (pull_request) Successful in 2m16s
CI / Tests / Coverage (pull_request) Successful in 38s
CI / Tests (pull_request) Successful in 0s
CI / Container / Build and push (pull_request) Successful in 14s
CI / Container (pull_request) Successful in 0s
CI / Deploy (pull_request) Has been skipped
2026-10-08 00:00:52 +00:00
Compare
forgejo-actions changed title from fix(deps): pin dependency cally to 0.9.2 to chore(deps): pin dependency cally to 0.9.2 2026-10-08 00:00:58 +00:00
forgejo-bot canceled auto merging this pull request when all checks succeed 2026-10-08 00:00:59 +00:00
forgejo-bot scheduled this pull request to auto merge when all checks succeed 2026-10-08 00:00:59 +00:00
renovate changed title from chore(deps): pin dependency cally to 0.9.2 to fix(deps): pin dependency cally to 0.9.2 2026-10-09 00:00:32 +00:00
forgejo-actions changed title from fix(deps): pin dependency cally to 0.9.2 to chore(deps): pin dependency cally to 0.9.2 2026-10-09 00:00:37 +00:00
forgejo-actions changed title from fix(deps): pin dependency cally to 0.9.2 to chore(deps): pin dependency cally to 0.9.2 2026-10-09 00:00:37 +00:00
forgejo-bot canceled auto merging this pull request when all checks succeed 2026-10-09 00:00:38 +00:00
forgejo-bot canceled auto merging this pull request when all checks succeed 2026-10-09 00:00:38 +00:00
forgejo-bot scheduled this pull request to auto merge when all checks succeed 2026-10-09 00:00:38 +00:00
forgejo-bot deleted branch renovate/pin-dependencies 2026-10-09 05:35:40 +00:00
Sign in to join this conversation.
No description provided.