chore: sync upstream rails-base_app #13

Merged
hobbypunk merged 4 commits from chore/upstream-merge into main 2026-10-03 21:14:29 +00:00
Collaborator

Upstream Sync

Merge style: Merge (merge commit, NOT squash) - the upstream history must stay linked.

Commits flowing in from hobbypunk/rails-base_app:

05fed4b chore: [114] adopt centralized upstream sync as template (#115)
d79f175 chore(deps): update dependency daisyui to v5.7.47 (#112)
## Upstream Sync > Merge style: **Merge** (merge commit, NOT squash) - the upstream history must stay linked. Commits flowing in from `hobbypunk/rails-base_app`: ``` 05fed4b chore: [114] adopt centralized upstream sync as template (#115) d79f175 chore(deps): update dependency daisyui to v5.7.47 (#112) ```
This PR contains the following updates:

| Package | Change | [Age](https://docs.renovatebot.com/merge-confidence/) | [Confidence](https://docs.renovatebot.com/merge-confidence/) |
|---|---|---|---|
| [daisyui](https://daisyui.com) ([source](https://github.com/saadeghi/daisyui/tree/HEAD/packages/daisyui)) | [`5.7.46` → `5.7.47`](https://renovatebot.com/diffs/npm/daisyui/5.7.46/5.7.47) | ![age](https://developer.mend.io/api/mc/badges/age/npm/daisyui/5.7.47?slim=true) | ![confidence](https://developer.mend.io/api/mc/badges/confidence/npm/daisyui/5.7.46/5.7.47?slim=true) |

---

### Release Notes

<details>
<summary>saadeghi/daisyui (daisyui)</summary>

### [`v5.7.47`](https://github.com/saadeghi/daisyui/blob/HEAD/CHANGELOG.md#5747-2026-09-30)

[Compare Source](https://github.com/saadeghi/daisyui/compare/v5.7.46...v5.7.47)

##### Bug Fixes

- btn-link with btn-disabled color ([#&#8203;4749](https://github.com/saadeghi/daisyui/issues/4749)) ([2719450](2719450179))

</details>

---

### Configuration

📅 **Schedule**: (UTC)

- Branch creation
  - At any time (no schedule defined)
- Automerge
  - At any time (no schedule defined)

🚦 **Automerge**: Disabled by config. Please merge this manually once you are satisfied.

♻ **Rebasing**: Whenever PR becomes conflicted, or you tick the rebase/retry checkbox.

🔕 **Ignore**: Close this PR and you won't be reminded about this update again.

---

 - [ ] <!-- rebase-check -->If you want to rebase/retry this PR, check this box

---

This PR has been generated by [Mend Renovate CLI](https://github.com/renovatebot/renovate).
<!--renovate-debug:eyJjcmVhdGVkSW5WZXIiOiI0NC4xMTkuMSIsInVwZGF0ZWRJblZlciI6IjQ0LjExOS4xIiwidGFyZ2V0QnJhbmNoIjoibWFpbiIsImxhYmVscyI6WyJhdXRvLW1lcmdlIl19-->

Reviewed-on: hobbypunk/rails-base_app#112
Merge remote-tracking branch 'base/main' into chore/upstream-merge
Some checks failed
CI / Quality / Bundler Audit (pull_request) Successful in 1m37s
CI / Quality / Brakeman (pull_request) Successful in 2m4s
CI / Quality / RuboCop (pull_request) Successful in 1m30s
CI / Quality (pull_request) Successful in 0s
PR Triage / Triage pull request (pull_request) Successful in 0s
PR Triage / Triage pull request-1 (pull_request) Successful in 1m18s
CI / Tests / Unit (pull_request) Failing after 1m32s
CI / Tests / System (pull_request) Failing after 1m33s
CI / Tests / Coverage (pull_request) Has been skipped
CI / Tests (pull_request) Failing after 0s
CI / Container / Build and push (pull_request) Has been skipped
CI / Container (pull_request) Failing after 0s
CI / Deploy (pull_request) Has been skipped
7dace87cda
Closes #114

## What

Adds the thin `upstream-sync` caller workflow so every project cloned from the base template inherits the upstream sync. The heavy lifting lives centrally:

- `shared/workflows/upstream-sync.yml` – reusable workflow (aud default `u:9:99cecbbd-…`)
- `shared/actions/forgejo-jwt`, `shared/actions/upstream-merge`, `shared/actions/upstream-sync-pr` – proven in hobbypunk/centinel#9

## Behavior

- **No-op by default**: without the `UPSTREAM_REPOSITORY` Actions variable the job skips – the base template itself has no upstream
- Activation in a derived project: set `UPSTREAM_REPOSITORY` (`owner/repo` or full `.git`-URL) + create the `upstream-sync` label
- Runs daily (`30 4 * * *`) + `workflow_dispatch` for manual runs, so consuming repos do not drift far apart
- Sync PRs are merged as **merge commits** (never squash) to keep the upstream history linked

Reviewed-on: hobbypunk/rails-base_app#115
Merge remote-tracking branch 'base/main' into chore/upstream-merge
Some checks failed
PR Triage / Triage pull request-1 (pull_request) Successful in 58s
PR Triage / Triage pull request (pull_request) Successful in 0s
CI / Tests / Unit (pull_request) Failing after 1m2s
CI / Quality / Brakeman (pull_request) Successful in 1m26s
CI / Quality / RuboCop (pull_request) Successful in 1m29s
CI / Quality / Bundler Audit (pull_request) Successful in 1m30s
CI / Quality (pull_request) Successful in 0s
CI / Tests / System (pull_request) Failing after 2m2s
CI / Tests / Coverage (pull_request) Has been skipped
CI / Tests (pull_request) Failing after 0s
CI / Container / Build and push (pull_request) Has been skipped
CI / Container (pull_request) Failing after 0s
CI / Deploy (pull_request) Has been skipped
191dc9ba48
hobbypunk deleted branch chore/upstream-merge 2026-10-03 21:14:29 +00:00
Sign in to join this conversation.
No description provided.